Gravel Driveway Installation in Ipswich

Gravel driveway installation in Ipswich, built on a dug out sub base with proper edging to hold the stone in place. Gravel drains well, costs less than a solid surface, and can be topped up rather than relaid.

Building a Gravel Driveway That Stays Put

Gravel spreads if there is nothing under it and nothing holding it in. We dig out the soft ground, compact a stone sub base, lay a membrane so the gravel cannot sink into the soil below, then fit the edging before any top stone goes down.

Gravel driveway installation in Ipswich with angular stone laid over a compacted base

More Information

Edging and Depth of Stone

Edging keeps gravel off the lawn and out of the road. Timber, brick and metal edging all work, and the choice usually comes down to the look you want. The top layer is kept to around fifty millimetres, because deeper gravel is harder to walk on and rutted by tyres.

Choosing the Right Gravel

Angular stone such as crushed granite or limestone locks together and stays put. Rounded pea shingle rolls under tyres and works its way towards the road. For a driveway we use angular gravel, usually ten to twenty millimetres, which grips underfoot and drains well.

About us

Gravel is one of the surfaces Gardenwise Landscaping and Gardening lays most, because it suits long village driveways where a solid surface would cost far more. With 25 years of groundworks behind us around Ipswich, we build the base the gravel sits on rather than tipping stone onto whatever is already there. Free quotations.

  • 25 years landscaping gardens in Ipswich

  • Free quotation on every job

  • Landscaping, fencing and paving from one team

  • Emergency call outs for storm damage

  • Open seven days a week

STILL NOT SURE?

Frequently Asked Questions

How long does a gravel driveway take to lay in Ipswich?

Most gravel driveways in Ipswich take two to four days. Digging out and carting the spoil away takes the first day or two, then the sub base, the edging and the gravel follow. Larger driveways or drainage work add time. We give a timescale with the quotation.

How do I stop gravel spreading onto the road?

Edging along both sides and a firm threshold at the entrance stop most of it. Keeping the top layer to about fifty millimetres helps too, because deep gravel gets kicked out. On a sloping driveway a stabilisation grid holds the stone in cells so it cannot migrate downhill.

Is a gravel driveway cheaper than a solid surface?

Yes, gravel is usually the cheapest driveway surface to lay, because once the base is down there is little labour in the surface itself. The trade off is upkeep. Gravel needs raking level now and again and topping up every few years, where resin stays as it was laid.

Our reviews