Decking Installation in Ipswich

Decking installation in Ipswich for level seating areas, raised platforms and decks over ground that stays soft. The frame underneath does the work, so it is spaced, supported and ventilated properly before any board goes down.

Building the Frame

The frame is what a deck stands or falls on. Joists are spaced to suit the board and the span, supported on posts or a solid base, and set with a slight fall so water runs off. Air has to move underneath, or the timber stays wet and rots.

More Information

Timber or Composite Boards

Timber decking costs less and can be stained any colour you like, but it needs cleaning and treating every year or two. Composite costs more up front, needs no treating and will not splinter. Both go down on the same kind of frame.

Keeping Decking Safe Underfoot

Decking gets slippery once algae builds up, particularly in shade. Grooved boards help a little, anti slip inserts help more, and regular cleaning helps most. Steps and raised decks also need handrails at the right height. We build that in rather than adding it later.

About us

Decking sits between the fencing and the landscaping sides of what Gardenwise Landscaping and Gardening does, and we have been building it in Ipswich gardens for 25 years. We build the frame on site rather than using kits, so a deck can follow an awkward shape. Free quotations.

  • 25 years landscaping gardens in Ipswich

  • Free quotation on every job

  • Landscaping, fencing and paving from one team

  • Emergency call outs for storm damage

  • Open seven days a week

STILL NOT SURE?

Frequently Asked Questions

Do I need planning permission for decking in Ipswich?

Decking under thirty centimetres above ground usually falls under permitted development, as long as it and other garden structures cover no more than half the garden. Raised decking that overlooks a neighbour can need permission. Check with the council if the deck will be high.

Is composite decking worth the extra cost?

It depends how long you plan to keep it. Composite costs more to install but needs no staining or treating, so over ten years the cost often evens out. Timber suits a smaller budget or a deck you are happy to look after each spring.

How long does decking take to build?

A straightforward ground level deck usually takes two to three days. Raised decks, steps, handrails and awkward shapes take longer, and any groundworks underneath add time. We give you a timescale with the quotation and let you know if the weather changes it.